Active Tender Opportunities
Ministry Of Transportation & Transit
Ministry of Transportation and Transit
Project: 16882MJ0000
|
09/17/2025 2:00 pm |
|
Ministry of Transportation and Transit
Project: 26243MJ0002
|
Phase 3 (of 3 phases) of the project includes slope re-grading and erosion protection and installation of 252 steel piles. |
09/18/2025 2:00 pm |
Ministry of Transportation and Transit
Project: 26031MJ0000
|
Demolition, removal and disposal of existing asphalt wearing surface, concrete bridge deck, existing bridge superstructure, bearing assemblies and plinths. Supply and installation of new bridge superstructure including steel I girders, disaphragms, bracings, new case-in-place concrete deck slab, parapets. Highway approach construction and supply and install of concrete barriers and signs. |
10/02/2025 2:00 pm |
Sunshine Coast Regional District
Sunshine Coast Regional District
Project: 2536603
|
The project consists of asphalt paving restoration over waterline trenching related to utility works. |
10/03/2025 3:00 pm |
Ministry of Forests
BC Timber Sales - Contracts
BC Timber Sales Branch
Project: EN26TEK488
|
The proposed contract is for is for mechanical roadside brushing within the Kamloops TSA. Approximate Kilometers of brushing are 40km. Work plans are subject to change throughout the year. |
09/18/2025 2:00 pm |
BC Timber Sales Branch
Project: EN26TFM024
|
BC Timber Sales has legal obligations to maintain access infrastructure to meet all FRPA and SAFETY (WCB/BC Safe Company) requirements. The East Kootenay Field Team (EKFT) manages hundreds of km’s of resource roads annually. BCTS will work with the Contractor to ensure that road maintenance standards are achieved. This is a solicitation for Right-of-Way Mechanical Brushing, with rates set by the brushing difficulty level, per kilometer. |
09/18/2025 2:00 pm |
BC Timber Sales Branch
Project: EN26TEK501
|
Merritt & Lillooet TSA is inviting tenders for a major works contract for EN26TEK501 – FSR Inspections, for planed projects on an “if and when needed” basis, to support the forest service road inspection program. Projects may be identified anywhere within the Merritt and Lillooet TSA area. |
09/24/2025 2:00 pm |
Municipalities
City of Delta
Project: 25-170 Delta
|
City of Delta invites bids for the construction of the 2025 paving Program, “the Work”, as described in the specifications and drawings provided as appendices to the Invitation to Tender. |
09/18/2025 2:00 pm |
City of Surrey
Project: 1220-040-2025-082
|
The Contractor shall furnish all necessary labour, supervision, materials, plant, equipment, layout, survey, permits, and inspections, and related services to asphalt road restoration for six water operations maintenance crews. There will be up to six sites daily, in which the road cuts may vary in size from 1m2 to 40m2. The contractor will provide services with 24 hours’ notice. Order quantities may be subject to change up to two hours before scheduled call out time. Furnish certificates confirming work conforms to requirements of Authorities having jurisdiction. The general component of Work includes, but not limited to, Supply & place materials and provide services for the items listed in Schedule C – Quotation, Table 1: Schedule of Quantities and Prices; |
09/25/2025 4:00 pm |
Township of Langley
Project: 25-209 TOL
|
Widening of approximately 530 meters of arterial roadway on 86 Avenue between 200 Street to 202B Street, including 250-300mm diameter watermain installation, flow meter chamber installation, 600mm diameter concrete culvert extension, concrete curb and gutter, raised medians, concrete bike curbs, multi-use-pathways, boulevard landscaping, street lighting, traffic signals, and communication conduit installation. |
09/25/2025 2:00 pm |
District of Lantzville
Project: 219623
|
District of Lantzville - Phantom Road Upgrade Project |
09/26/2025 2:00 pm |
City of Port Coquitlam
Project: RFEOI 2025-30
|
The Corporation of the City of Port Coquitlam (City) is requesting Expressions of Interest from qualified vendors for the supply and delivery of Hot In-Place Asphalt Recycling (HIPAR) equipment capable of delivering 100% on-site recycling with no offsite trucking, disposal, or plant processing. The goal is to identify advanced, field-tested technology that supports environmentally sustainable and cost-effective pavement rehabilitation of residential streets within British Columbia and Metro Vancouver. Interested vendors must also be able to provide ongoing support for the HIPAR system for a period of 18-months. |
09/30/2025 2:00 pm |
Sunshine Coast Regional District
Project: 2536603
|
The project consists of asphalt paving restoration over waterline trenching related to utility works. |
10/03/2025 3:00 pm |
Alberta
Bid Results
Project: EN24474048
|
Project: 5181309
|
Contract Awards
Project: RFP 21488
|