Active Tender Opportunities
Procurement Services Branch
Ministry of Transportation & Transit
|
Ministry of Transportation and Transit
Project: 17093MJ0002
|
Construction of Multi-Use Pathway (MUP) south of Englishman River Bridge in Parksville, BC and north of Resort Drive. Realignment of Plummer Road and a crosswalk for pedestrians and cyclists. Resurfacing of Plummer Road, Highway 19A, and Riverside Road. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/232669
|
10/14/2026 2:00 pm |
Ministry of Forests
BC Timber Sales - Contracts
|
BC Timber Sales Branch
Project: EN27TIJ404A
|
The Skeena Business Area is advertising a multi-year road and bridge construction contract located at the end of the Copper FSR (60.7km). The work includes 722m of road reconstruction, 668m of new construction and the installation of a 42.6m steel girder bridge. The road reconstruction section has been brushed out and will require some reconstruction consisting of ditching, re-establishing the road surface and pullout construction. The new construction starts from the end of the road reconstruction with 240m through immature timber (3-4m tall). The remaining 428m of new construction is through mature timber. The Ministry will provide the 42.6 m bridge, concrete bridge deck panels, concrete ballast walls, bridge bearing pads, piles, and culverts required for the Work. The Ministry will also supply a 21m or 27 m bridge for use as a temporary crossing. These materials are stored at the Ministry Forest Yard in Terrace, British Columbia, and will be made available to the Contractor for use on the Project. A crane will be supplied at the Ministry yard for loading the bridge components. The Contractor is responsible for transporting, unloading and handling all bridge materials at the site. Rip rap for bridge construction is anticipated to be sourced from the road construction activities or quarry sites. Rip Rap can be produced from a rock source located 50 m down chain, from the Br.1300 junction and the start of reconstruction. Surfacing aggregate can be generated from an established Rippable rock quarry 1.1 km up the Br.1300 if needed. Bidders are to include the cost of producing and hauling rip rap and surfacing aggregate from the identified quarry locations within the applicable bid line items. The Ministry will provide a professional engineer to inspect, supervise and sign off on final bridge installation. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/234225
|
10/14/2026 2:00 pm |
Municipalities
|
City of North Vancouver
Project: 233964
|
The City of North Vancouver (CNV) invites quotations from qualified contractors to provide asphalt pavement crack sealing services on streets, lanes, and other paved municipal surfaces throughout the CNV. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/233964
|
10/15/2026 4:00 pm |
|
City of Vernon
Project: 26-75-INF
|
This notice of Request for Proposals (the “RFP”) is issued by The Corporation of the City of Vernon in British Columbia, Canada (the “City”) to prospective proponents to submit proposals for the Kalamalka Lake Road Construction, as further described in the RFP documents. The construction of an active transportation network along Kalamalka Lake Road from 14th Avenue to Highway 6, Pottery Road, new traffic signals at Pottery Road and Highway 6, barrier protected multiuse path and cycle paths on Polson Drive, 14th Ave, and Pottery Road from Highway 6 to 15th Street. This RFP also contains associated road reconstruction, drainage works, sanitary upgrades, and active transportation extensions on adjacent streets. In addition to the work contracted to the City of Vernon the successful bidder will also need to contract with the Regional District of the North Okanagan (RDNO) for the associated watermain works. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/234363
|
10/20/2026 2:00 pm |
|
City of Burnaby
Project: CA-7026-3487-3345-3355
|
The Works shall include but are not limited to 5,785 metric tonnes of roadway asphalt, 1,905 square meters of full depth milling, 2,295 square meters of reshaping, 30,885 square meters of surface milling, 560 lineal meters of concrete curb and gutter, 830 square meters of concrete sidewalk and driveway crossings, 170 square meters of concrete truck apron, 60 tonnes of asphalt multi-use pathway, 860 metric tonnes of gravel, traffic islands, landscaping, restoration, pavement markings, signage, adjustments, drainage, traffic signals, and streetlighting. The performance of the Works shall be along the following roadways: Marine Way: Market Crossing to Byrne Road; https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/234427
|
10/22/2026 3:00 pm |
|
City of North Vancouver
Project: 234734
|
The City of North Vancouver (CNV) invites quotations from qualified contractors to provide asphalt pavement crack sealing services on streets, lanes, and other paved municipal surfaces throughout the CNV. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/234734
|
11/05/2026 4:00 pm |
|
Village of Port Alice
Project: 234017
|
The Village of Port Alice invites tenders for the Marina Bridge Rehabilitation project which includes: The contract consists of, but is not limited to, the supply of equipment, labour and materials as required to fulfill the rehabilitation requirements, as set out in the project design drawings, for the rehabilitation of the Marina Bridge located on Marine Drive (Port Alice Road) in Port Alice, BC. In general, the work consists of the repair of existing bridge abutment fill slopes, installation of precast concrete block wingwalls, installation of a pedestrian bridge and guardrail and approach barrier replacement. https://www.bcbid.gov.bc.ca/page.aspx/en/bpm/process_manage_extranet/234017
|
11/13/2026 4:00 pm |
Alberta
|
Alberta Transportation & Economic Corridors
Project: TND0023063
|
Bridge Culvert Replacement and Other Work 40:32 BF85365 Carrying Hwy 40 over Unnamed Tributary to Cabin Creek kilometre 19.914 to 19.914 NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump sum Traffic Accommodation for Bridge Construction Contractor to supply all materials. Contract Completion Date: October 15, 2027. https://purchasing.alberta.ca/posting/AB-2026-06479
|
10/21/2026 1:01 pm |
|
Alberta Transportation & Economic Corridors
Project: TND0025484
|
PEACE REGION APPROXIMATE QUANTITIES: 2,800 Cubic Metre Common and/or Borrow Excavation Loaded to Trucks Contractor to supply all materials. Contract Completion Date: September 30, 2027. https://purchasing.alberta.ca/posting/AB-2026-06567
|
10/27/2026 1:01 pm |
|
Alberta Transportation & Economic Corridors
Project: TND0026142
|
28:04 Range Road 224 (Opal Road) Intersection, 7 km west of Redwater North Central Region APPROXIMATE QUANTITIES: 955 M Underground Electrical Conduit - Supply and Install – Trench Excavation Contractor to supply all materials. Interim Completion Date: April 30, 2027 https://purchasing.alberta.ca/posting/AB-2026-06732
|
11/10/2026 1:01 pm |
|
Alberta Transportation & Economic Corridors
Project: TND0025519
|
1:18 W. of Hwy 875 to 20 Km W. of Hwy 884 - kilometre 18.440 to 54.896 (EBL) 884:02Hwy 1 to 5 Km N. of Hwy 1 - Kilometre 0.110 to 5.345 875:043 Km S. of Hwy 1 to Hwy 1 - Kilometre 46.600 to 49.177 Southern Region APPROXIMATE QUANTITIES: HWY.1:18 (KM 18.440 TO KM 54.896): HWY.884:02 (KM 0.110 TO KM 5.345): HWY.875:04 (KM 46.600 TO KM 49.177): Contractor to supply all materials. Contract Completion Date: October 31, 2027. https://purchasing.alberta.ca/posting/AB-2026-06734
|
11/10/2026 1:01 pm |
Bid Results
Project: EN27TKE150 - TOC
|
Contract Awards
Project: 8495P
|